1. During installation, it is imperative to apply lubricant to the inner hole of the shaft sleeve and O-ring to ensure a smooth installation process. (Note: The use of petroleum-based lubrication oil is not recommended for EPR applications.)
2. Once the mechanical seal has been properly installed, it is crucial to dismantle the hexagon socket cap screws 1 and locating block 2 prior to initiating machine operation.
3. The flushing water pressure must be maintained at a level 0.1 MPa higher than the pressure of the media.
4. Before starting the pump, it is essential to open the quench water for a duration of 5 minutes prior to pump activation and to close the quench water for 5 minutes after shutting down the pump.
Note:
For assistance in selecting the appropriate mechanical seal model, kindly refer to Zigong Zhaoqiang Sealing Products Industrial Co., Ltd. Contact Email: marketing@zhaoqiangseal.com